This was an upgrade on controls, valving, new breaker installed, addition of a silo alley and 2 new silos. We also installed all new twin screw pumps and a new chill press.
American Egg Phase 2 is the ESL addition. That included all new fillers for gable top containers, bag in box filler, pasteurizing equipment, Aseptic tank, addition of a new silo, chiller, refrigeration, HVAC, boiler, MCC room, packaging lines, robot for pallet wrapping and stacking.